Login   Registration
  Home >Service Details
   
  Service Details
 
 
H. Flow Study in Drainage Conduit (流量監控)
 
       
   
  BUDA in association with one of the world's leading Flow Monitor Contractors, arranges Installation, Data Collection and Preparation of Written Reports on all aspects of this service. Final Reports and Data Analysis will be completed by experienced and qualified engineers.  
 
     
 

Picture 1 : Installing Monitor
 
Picture 2 : Monitoring drainage
 
Picture 3 : Preparation
 
 
 
To TopTop
 
 
 
  Home Page Contact Us Site Map Links
 
  Our Services
 
 
Engineers & Consultants
Consultancy services; Water convservation; Geophysics and more
 
 
 
Surveying
Utility detection; Topographical survey
 
 
About Us | News & Events | Services | Projects | R&D | Safety & Health | Environmental Study | Clients & Partners | Career |
Copyright @ 2004 BUDA Group (Holdings) Limited  Disclaimer